Rider Alert: Molonglo Valley

Featured News, News, Rider alert 0 106
Rider Alert logo

The first stage of infrastructure works are underway in the Molonglo Valley as follows:

• upgrading 900 metres of Coppins Crossing Road (to be known as John Gorton Drive), south of William Hovell Drive to a dual carriageway
• upgrading and signalising the intersection of John Gorton Drive and William Hovell Drive
• building a signalised intersection on John Gorton Drive
• constructing a water main from Weetangera Reservoir to Whitlam.

Works will take place at the intersection of William Hovell Drive and Coppins Crossing Road from Friday 30 November to Friday 7 December 2018. There will be no right turn into Coppins Crossing Road (John Gorton Drive) from William Hovell Drive eastbound between 10 am and 7 pm daily. Road users will be detoured via Coulter Drive.

For more information visit www.tccs.act.gov.au or contact Access Canberra on 13 22 81.

Facebooktwittergoogle_pluspinterestlinkedinmail

Related Posts

Leave a comment

You must be logged in to post a comment.

Latest News & Comments

Choose a Category

News Archives