Rider Alert: Soward Way Bridge

Featured News, News, Roads and infrastructure 0 225
alert

The southern pedestrian pathway on the Soward Way bridge will be closed for use due to ACTEW replacing the high voltage feeder from the Tuggeranong Sub-station to Sulwood Drive Sub-station.

The closures will occur from  7.00am on Monday 24 July 2017 until 5.00pm 30 September 2017 while the new conduits are installed.

The main community pathway is on the northern side of the bridge & this will be open as usual, but the pedestrians traffic on this will be increased due to the closure.

There will be a detour sign posted directing pedestrians to the northern side.  Please be aware of a possible increase in foot traffic at this crossing point.

soward way bridge

Facebooktwittergoogle_pluspinterestlinkedinmail

Related Posts

Leave a comment

You must be logged in to post a comment.

Latest News & Comments

Choose a Category

News Archives