The Australian Sports Commission and Australian Institute of Sport in Bruce would like to notify cyclists of a temporary closure of the bike path that runs through the AIS.
The AIS is undertaking a building project that will result in continual, high flow truck movement on site. To ensure the safety of bike riders, as of Monday 8 July 2019 from 7AM, the foot/cycle path, that comes off Battye St and runs along the back of site past the Arena, past the tennis courts and down to the horticulture shed will be closed off until Monday 15 July 2019.
All bike riders will be diverted down Leverrier st, onto Masterman St and will join the bike path off Masterman St (directional signage will be located in the appropriate positions). See map provided by AIS - https://www.pedalpower.org.au/wp-content//uploads/2019/07/AIS_Closure_MudMap-1.pdf